Site Stade De Martin
Deep Foundation Pile Installation
Project Name
Site Stade De Martin
Project Location
Boulevard triomphal, DRC
Project Status
Completed
Project Type
Deep Foundation Piles
Project Overview
The Site Stade De Martin Project involves the construction of deep foundation piles to support a planned structural development. The works include the installation of 800 mm diameter cast-in-place bored piles reaching depths of up to 16 meters, designed to transfer building loads into competent soil layers and ensure long-term stability.
Located near the Kinshasa Arena, the site conditions require careful attention to drilling precision, verticality control, and concrete quality to achieve reliable pile performance. The foundation system is engineered to provide the necessary capacity, durability, and serviceability for future construction on this urban site.
Key Project Highlights
- 800 mm Diameter Bored Piles:
Designed as the primary deep foundation elements for the structure. - Up to 16 m Pile Depth:
Ensuring load transfer into competent strata and minimizing settlement. - Cast-In-Place Installation Method:
Providing flexibility and quality control during construction. - Urban Site Near Kinshasa Arena:
Requiring precise execution and controlled operations in a constrained environment. - Engineered for Long-Term Stability:
Foundation system designed to support demanding structural loads.