Site Office des Routes

Deep Foundation, Shoring & Dewatering Works

Project Name

Office des Routes Project

Project Location

Ave Des Ambassadeurs, DRC

Project Status

Completed

Project Type

Deep Foundation & Shoring

Project Overview

The Office des Routes Project involved the construction of a deep foundation and shoring system designed to support a complex excavation under challenging ground conditions. The foundation works consisted of 800 mm bored piles installed to depths of up to 8 meters below foundation level, ensuring adequate load transfer to competent layers.

To safely support an excavation of approximately 6 meters, a shoring wall system made of 600 mm diameter piles extending to 16 meters was constructed, providing essential lateral stability. Due to groundwater presence and soil variability, a dewatering system was implemented to maintain dry and controlled working conditions throughout execution.

This integrated approach ensured structural stability, enhanced construction safety, and delivered a durable foundation solution for long-term project performance.

Key Project Highlights

  • 800 mm Bored Foundation Piles:
    Installed to depths of up to 8 m to support structural loads.
  • 600 mm Shoring Wall Piles:
    Extended to 16 m to retain and stabilize a 6 m deep excavation.
  • Comprehensive Dewatering System:
    Implemented to maintain dry and stable excavation conditions.
  • Complex Ground Conditions:
    Design tailored for variable soil behavior and groundwater presence.
  • Integrated Foundation + Shoring Solution:
    Ensured structural safety, stability, and long-term performance.
  • High-Safety Construction Approach:
    Continuous monitoring and controlled execution strategies.