Site RAW Bank Boulevard

Deep Foundation & Shoring System

Project Name

Site RAW Bank Boulevard

Project Location

Boulevard 30 Juin, DRC

Project Status

Completed

Project Type

Deep Foundation & Shoring

Project Overview

The RAW Bank Boulevard Project involved the execution of a deep foundation and shoring system to support a complex excavation within an urban environment. The works included the installation of bored piles reaching depths of up to 21 meters, designed to safely transfer structural loads to competent soil layers and ensure long-term stability.

To support the excavation, a shoring wall system was constructed to retain surrounding soils and control lateral movements. Due to groundwater presence, a dewatering system was implemented to maintain dry and stable working conditions throughout construction. The integrated foundation, shoring, and dewatering approach ensured safe execution, structural integrity, and reliable performance under challenging ground conditions.

Key Project Highlights

  • Deep Foundation System:
    Bored piles installed to depths of up to 21 meters to ensure secure load transfer.
  • Shoring Wall System:
    Engineered retaining structure providing lateral support during excavation.
  • Dewatering System:
    Implemented to control groundwater and maintain dry excavation conditions.
  • Complex Urban Excavation:
    Design adapted to restricted site conditions and surrounding infrastructure.
  • Integrated Engineering Approach:
    Foundation, shoring, and groundwater control designed to work together efficiently.
  • Long-Term Structural Performance:
    System designed to ensure durability, safety, and serviceability of the development.